# Install PMC CLI · Chromia Docs (concept)

> The Postchain Management Console (PMC) CLI is a command-line interface that submits transactions to the management chain, crucial for managing your node within…

Source: https://docs.chromia.com/ecosystem/providers/nodes/install-pmc/

# Install PMC CLI

The Postchain Management Console (PMC) CLI is a command-line interface that submits transactions to the management
chain, crucial for managing your node within the Chromia network.

To ensure security, install PMC on a separate, trusted machine rather than the server where the node operates. Java 21
is required to run PMC, so make sure it's installed first.

For step-by-step instructions to install PMC, you can refer to the
[PMC CLI installation guide](https://docs.chromia.com/ecosystem/providers/pmc/pmccli-installation/).

Once installed, verify its setup by checking the version:

Terminal

```
pmc --version
```

Next, you'll configure the [Provider key pair](https://docs.chromia.com/ecosystem/providers/nodes/provider-keypair/), which serves as your identity within the Chromia
network. It’s important to store this keypair securely, as it plays a critical role in network operations.

[View this page on docs.chromia.com](https://docs.chromia.com/ecosystem/providers/nodes/install-pmc/)Content mirrored from the live docs
